
Description
Road will be paved within approximately a year. the balance of the subdivision is being redone to include a better plan. No known expansion of Central as it doesn't go any further than 64th Street West and it would have to cross the rail road. Going west it runs into a section of school land at 80th. View are from east to west in a general southern sight. Address need to be a final set numberthe contract has been signed for water to irrigate the individual lots. The sysstem should be operative by June, 22Currently there are 5 homes under construction. Good time to chose a lot.
-
0BEDS
-
1ACRES
-
0BATHS
-
01/2 BATHS
School Information
Description
Road will be paved within approximately a year. the balance of the subdivision is being redone to include a better plan. No known expansion of Central as it doesn't go any further than 64th Street West and it would have to cross the rail road. Going west it runs into a section of school land at 80th. View are from east to west in a general southern sight. Address need to be a final set numberthe contract has been signed for water to irrigate the individual lots. The sysstem should be operative by June, 22Currently there are 5 homes under construction. Good time to chose a lot.